In principle Institute of Science and Technology Al Kamal Jakarta belongs to the people who always put the quality of higher education. However, ISTA Jakarta Leading the Higher Education and Accreditation still has SOCIAL COMMITMENT. Among others, to assist students in paying the cost of education by providing tuition credit facilities without interest, so the tuition fee can be paid in installments according to the ability of prospective students.
ISTA Jakarta to make the cost of education is only comprised of 2 components only. 1. Development Contributions (SPb) or Money Jetty |
| Development Contributions can be repaid according to the study period, which can be repaid up to: » 36 times for graduate SMA, SMK, equivalent proceed to S1 Program » 18times for graduate D3 equivalent proceed to S1 Program » The first minimum payment = IDR.250.000 proceed to S1 Program And the remainder scheduled to yourself appropriate installment table below.
| | 2. Contribution of Education each semester (SPP) |
| The SPP has included BPP Basic, cash credits, examination fees, registration, and money practicum each semester. Any number of credits taken in a semester, tuition did not change. This SPP is paid each semester to a few times,, which can be repaid six times (1 semester = 6 months) with » minimum first payment = IDR 750.000 to continue to Bachelor’s Degree. » minimum first payment = IDR 950.000 to continue to Bachelor’s Degree in Chemical Engineering. » minimum first payment = IDR 1.250.000 to continue to Bachelor’s Degree in Pharmacy. And the remainder scheduled to yourself appropriate installment table below.
| | Total First Payment |
| Total First Payment = Installment 1 for the SPb + Installment 1 for the SPP + Jackets Civitas : » Rp (250.000 + 750.000 + 150.000) = Rp 1.150.000 to continue to Bachelor’s Degree. » Rp (250.000 + 950.000 + 150.000) = Rp 1.350.000 to continue to Bachelor’s Degree in Chemical Engineering. » Rp (250.000 + 1.250.000 + 150.000) = Rp 1.650.000 to continue to Bachelor’s Degree in Pharmacy.
|
The remaining installments paid in installments as the table below.
Table Installment Development Contributions (SPb) Businessman Program (Hybrid / Blended) ISTA JakartaA.1. | SPb Installment Table at ISTA | | For SMA, SMK, or equivalent graduates continuing to Bachelor’s Program (S1) |
Installment | The number and amount of installments | 36 x | 24 x | 12 x | 4 x | 1 x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19-23 24 25-35 36 | 250.000 180.000 180.000 180.000 180.000 180.000 180.000 180.000 180.000 180.000 180.000 180.000 180.000 180.000 180.000 180.000 180.000 180.000 180.000 180.000 180.000 130.000 | 275.000 275.000 275.000 275.000 275.000 275.000 275.000 275.000 275.000 275.000 275.000 275.000 275.000 275.000 275.000 275.000 275.000 275.000 275.000 175.000 -- -- | 542.000 542.000 542.000 542.000 542.000 542.000 542.000 542.000 542.000 542.000 542.000 538.000 -- -- -- -- -- -- -- -- -- -- | 1.625.000 1.625.000 1.625.000 1.625.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- | 8.000.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- |
Table Installment Contribution of Education each semester (SPP) Businessman (Hybrid / Blended) Institute of Science and Technology Al Kamal JakartaB.1. | ISTA SPP Installment Table | | For SMA/SMK, D3, etc. graduates continuing to Bachelor’s Program (S1) |
Installment | The number and amount of installments | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 800.000 760.000 760.000 760.000 760.000 760.000 | 920.000 920.000 920.000 920.000 920.000 -- | 1.150.000 1.150.000 1.150.000 1.150.000 -- -- | 1.540.000 1.540.000 1.520.000 -- -- -- | 4.600.000 -- -- -- -- -- |
| |
| |